Build progress

Updates

Build logs and testing notes as Prototype 1.0 comes together.

Milestone

25 August 2026

Prototype 1.0 project brief approved

The project brief for Prototype 1.0 was approved, setting eleven requirements (R-01 to R-11), each with its own verification method. It defines the vehicle as a tethered proof of concept for controlled surge, heave, and yaw, and commits the team to the V model, with four formal reviews between requirements and pool trials.